Kejuruteraan JEC

Scope Of Services

The range of services from JEC may be summarised to be from conceptual evaluation through to design, implementation, contract management, supervision and continuing services associated with operation and maintenance.

Our Services can be categorized as

•    Engineering
•    Contracts
•    Project Management
•    Services by Associates

Engineering

The Scope of Services available under JEC ‘Engineering’ may be summarised as :-

• Conceptual Evaluation through Pre-feasibility or Feasibility Studies
• Detail Design and Contract Documentation
• Tender and Recommendation for Award
• Contract Management and Supervision
• Continuing Services under Operation and Maintenance

This Scope may be extended to

• Transportation
• Roads, Highways and Bridges
• Jetty, Wharf Terminals
• Public Health
• Water Supply, Treatment and Distribution
• Sewerage, Sewage Treatment and Disposal

• Drainage and Irrigation
• Drainage & Irrigation Channels, Gates, Regulatory Structures
• Wells and Pumping Stations

• Industry and Factory Building
• Plantation Infrastructure

• Civic and Town Development
• Schools
• Shops, Markets and Commercial Complexes

Contracts

The Scope of Services available under JEC ‘Engineering’ may be summarised as :-

• Preliminary Estimates
• Contract Documentation
• Contract Management

Other related application techniques include :-

• Aerial surveys
• Hydrographic surveys

Project Categories

Roads and Bridges

Jan 82 – Feb 82Site engineer for the Asajaya sub-project supervising the soil investigation contracts for the bridge embankments, tidal control structures and road foundation totalling RM1.5m. The work was in estuarine clay with extension into peat regions.
May 82 – Dec 82Project Engineer for the topographic survey and road design for the Miri/Bintulu/Ulu Niah road. The length was 17 km including culverts and bridges design.
Oct 85 - May 86Project Engineer for the Lubai bridge near Limbang in 1986. The project was tendered in mid 1986 and cost RM4.2m. It was a 3 span pre-stressed girder bridge.
June 86 - April 87Project engineer for the Grigat / Selalang Road for JKR. The project required engineering survey and design of the road. The length of the road was 17 km.
July 88Performed Feasibility Study on upgrading and improvement to 48km of timber haul road for hauling coal inclusive of 25 nos. crossings made up 12m to 40m span bridges.
June 88Project Engineer on Proposed Bangkit Rembai/Bangkit Ijok/Suri Road, Debak – feeder road for JKR Sarawak. Project value RM5.2m.
June 89Consulting engineer on Proposed Improvement and Widening of Jalan Batu Lintang for City North Kuching Commission. Project value RM1.8m.
January 91Consulting engineer on Proposed Lubok Antu/Lemanak/Engkari (Package A) Road, Sri Aman Division for JKR. The estimated distance is 20 km. Project value RM16m.
October 94Consulting engineer for Proposed Stapang/Rh. Takin Road, Sibu Division. Project value RM4.2m.

December 2000Consulting engineer for Proposed Improvement For Existing Access Road From Damai Roundabout To Sarawak Cultural Village/Holiday Inn Resort Damai Lagoon on Plot L, Salak Land District, Pantai Damai, Santubong, Kuching, Sarawak.
January 2003Consulting engineer for the Construction & Completion of the Bridges Replacement Project in Sarawak for Titanium Construction Sdn Bhd.
May 2023Consulting engineer for Projek Membina Jambatan Di SK Nanga Spak, Layar, Bahagian Betong, Sarawak. (Project in progress)
June 2023
Consulting engineer for Cadangan Membina Jalan Ulu Tubai Menuju Ke Mentawai/Gunung Buda, Bahagian Limbang. (Project in progress)

Jetty & Wharf

Jan 83 – Dec 83Project engineer for the new Sijingkat shipyard equipped with a ship-lift system of 2040 DWT x 70m long piers and 142m long quay. There was also a lateral transfer yard to complete the marine facilities.
June 87 Consulting engineer to Global Minerals (Sarawak) Sdn. Bhd. for foundation designs to 50T weigh bridge, coal crushing plants and jetties, generator house and water supply. Project value RM2.0m. Consulting engineer to Brooke Dockyard & Engineering Works Corporation on preliminary cost estimates to Proposed Fabrication Yard in Bintulu.
January 2004Consulting engineer for Proposed New Jetty, 23m Long Gangway and Pontoon at Batang Ai, Lubok Antu, Sri Aman Division for Majlis Daerah Lubok Antu.

Water Supply

Sept 79 – Dec 81Investigating and graduate design engineer for New Bintulu Water Supply Project (RM108m) including earth dams, pump stations, treatment plant, RC reservoirs and steel pipes with concrete linings.
Jan 84 – Mar 85Project Engineer for the Stage I Augmentation in New Bintulu Water Supply project where additional pumps, motors and ancillary equipment were designed, tendered and installed. Project engineer for the proposed coastal protection works for the hotel and commercial development project in Bintulu near Tg. Batu. Engineering Survey Co-ordinator for the Proposed Sijingkat Industrial Park. The area surveyed was 1,200 ha.

June 91 Consulting engineer on Proposed Long Laput Water Supply for JKR. Project value RM2.0m. Consulting engineer on Proposed Balai Ringin Water Supply Extension for JKR. Project value RM4.0m. Consulting engineer on Proposed Sematan Water Supply Extension for JKR. Project value RM5.5m.
March 2002Consulting engineer for Proposed Tebedu Extension Water Supply, Samarahan Division. (deferred to 2010)
January 2003Consulting engineer for Proposed 1.4MLD Prefabricated Treatment for Tebedu Water Supply, Samarahan Division.
2010Consulting engineer for proposed Tebedu Extension Water Supply, Samarahan Division, Sarawak. RM90m (Funding by KKLW)

Sewerage, Sewage Treatment & Disposal

April 85 – Sept 85 Project engineer for Bintawa Fishing Village Sewerage and Drainage project for KMC. The population catered for was 4,000.

Drainage & Irrigation

September 91Consulting engineer on Proposed Kuala Lawas Drainage Scheme, Lawas, Bahagian Limbang for DID. Project value RM2.0m.

Industry, Infrastructure and Plantation

Jan 83 – Dec 83Assistant co-ordinator for the Kalaka-Saribas IADP feasibility study. The project area was 162,000 ha.
June 86 – April 87Team leader for the Infrastructure Design of the Sijingkat Industrial and residential areas totalling over 1,000 acs.
June 87Consulting engineer to Brooke Dockyard & Engineering Works Corporation on preliminary cost estimates to Proposed Fabrication Yard in Bintulu.
January 88Consulting engineer to SALCRA for proposed village scheme at Gensurai, Spaoh. Project value RM2.5m.
August 88Consulting engineer for Gold Coin Sarawak Bhd. for Extension to Finished Product Godown and Hopper.
November 88Project Engineer on supervisory services to SALCRA for Proposed Village Scheme at Gensurai, Spaoh.
March 1990Consulting engineer on Proposed Mukah Mini Industrial Estate for Ministry of Industrial Development, Sarawak. Project value RM2.0m.
July 92Consulting engineer on Proposed Batang Layar Integrated Agriculture Station, Betong. Project value RM7.5m.
August 93Consulting engineer on Proposed Timber Processing Complex on Lot 1403, Pending Industrial Estate, Kuching. Project value RM3.5m.
October 95Consulting engineer for Proposed Individual Quick Freeze (IQF) Plant at Tarat, Kota Samarahan Division. Project value RM22m.
September 99Consulting engineer for Proposed Pusat Kecemasan Bahagian Kuching, Jabatan Laut, Muara Tebas.
August 2001Consulting engineer for the Infrastructure Works of the Proposed Sarikei Light Industrial Area (Extension), Sarikei Division.
August 2001Consulting engineer for Proposed Kuala Baram Ready Built Factory Project.
January 2003Consulting engineer for Perlantikan Untuk Pembinaan Stesen DGPS Muara Tebas for Jabatan Laut Sarawak.
January 2003Consulting engineer to JEC Designabuild Sdn Bhd, for Projek Pembangunan Pembinaan Gudang Stockpile Jabatan Laut Sarawak Di Kuching, Bintulu dan Miri (Kuala Baram).
July 2004Consulting engineer for Installation of Cable Antenna Transmission Dish & Lighting Arrestor for Temporary use on Rooftop for Datacom Sdn Bhd.
April 2005Consulting engineer for Construction and Completion of New Lighthouse at Tg. Lobang, Miri, Sarawak.
April 2005Consulting engineer for Construction and Completion on New Lighthouse at Pulau Burong, Sarawak.
December 2009Consulting engineer for Project : FY08-Integrated Marintime Survillance System (IMSS) – Pulau Bakungan Kecil, Limau Limau (Pulau Jambongan), Pulau Banggi (Dogoton) & Kinabatangan.
June 2010Consulting engineer for proposed upgrading and improvement to the existing chicken processing plant at Jalan Bako, Kuching.
2013Consulting engineer for proposed raw water supply system for SALCRA Palm Oil Mill upgrading at Lubok Antu.
2013Consulting engineer to SALCRA for palm oil mills at Bau, Serian & Saratok to survey and produce as-built drawings for M&E consultant to design for implementation in order to qualify for Fire Certificate from Bomba.

Schools, Training Centre & University

May 82 – Dec 82Project engineer for the Student Housing Development phase for University Pertanian Campus in Bintulu. This housing development catered for over 2,500 students.
Jan 83 – Dec 83Project engineer for SMK Tatau.
August 89Consulting engineer on Proposed Forestry Training Centre for JKR, Sarawak. Project value RM8.0m.
November 93Consulting engineer on Proposed Mechanical Workshop and Wood Preservation Building at Timber Research and Technical Training Centre 7th Mile, Kuching. Project value RM0.75m.
October 2000Consulting engineer for Proposed S.M.K. Kapit No. 2, Kapit.
April 2007Consulting civil engineer (sub-consultant) for Cadangan Kompleks Kemudahan Sukan dan Rekreasi di kampus Universiti Malaysia Sarawak (UNIMAS) Kota Samarahan, Sarawak.
November 2007Consulting engineer for SK Nanga Ajau, SK Pusa and SK Beladin, Betong Division, Sarawak. (RM70m)
2014Cadangan Menyiapkan Projek Pembinaan, Penaiktarafan dan Pembaikpulihan Sekolah-Sekolah dan Asrama Di Negeri Sarawak : Sekolah Kebangsaan Beladin (30BD, 2BD J-QAF dan 15RG) di atas Lot 753, Blok 15, Sablor Land District, Betong, Sarawak. (re-tender RM17m)
2018Consulting engineer for Proposed Development of Worship & Community Centre on Lot State Land Lot 6591, K.N.L.D. Kuching for Borneo Evangelical Mission (BEM).
2018Consulting engineer for Proposed Private Primary School (12 classrooms) and Related Facilities on State Land Lot 674, Block 12 Muara Tebas Land District Kuching for Borneo Evangelical Mission (BEM).
2019Consulting engineer for Proposed New Classroom Block to existing school on Lot 5476, Section 63, Kuching Town Land District, Jalan Sungai Apong, Kuching.
2021Consulting engineer for Pembinaan Gantian Penuh 12 Bilik Darjah dan Lain-Lain Kemudahan Sekolah Kebangsaan, Jalan Haji Baki Padawan, Sarawak.

Civic & Town Development

March 90Consulting Engineer on Proposed Islamic Museum at Existing Madurasah Melayu Building at Jalan P. Ramlee, Kuching for JKR Sarawak.
September 90Consulting engineer on Proposed Holiday Inn Damai Beach Extension for SEDC. Project value RM14m.
February 92Consulting engineer on Proposed Stutong Forest Park on Lot 1279, Block 11, Muara Tebas Land District, Kuching. Project value RM2.0m.
June 92Consulting engineer on Proposed Sport Complex, Betong, Sri Aman Division. Project value RM2.5m.
October 94Consulting engineer for Proposed Slope Protection at HIDB Santubong, Kuching. Project value RM3.2m.
July 97Consulting engineer on the Proposed Privatisation of Kuching Riverfront Development. Project value RM400m.
April 99Consulting engineer for Proposed Riverfront Esplanade Extension, Kapit.
December 2000Consulting engineer for Proposed Refurbishment for HIR Damai Beach and HIR Damai Lagoon.
January 2004Consulting engineer for Proposed Repair to Spalling Concrete at Slab, Column and Beam to Soffit of RC Slab of Restaurant and Stainless Steel Handrail at Holiday Inn Resort Damai Lagoon Plot L, Salak Land District, Pantai Damai, Santubong, Kuching, Sarawak for Sara Resorts Sdn Bhd.
2014Proposed conversion of part of ground, 1st & 2nd floor, 3rd & 4th floor of the existing Permata Multi-Storey Carpark to Urban Transformation Centre (UTC) on Lot 366 (Same as parent lots 218, 337 & 351 [Plot 1]), Section 47, Kuching Town Land District, Bukit Mata Kuching, Sarawak. (RM50m)
2016Proposed Conversion Part of Ground Floor and First Floor of the existing Miri Council Multi-Storey Carpark to Urban Transformation Centre (UTC) Miri on Lot 526, Block 9 at Kwang Tung Road, Miri. (RM30m)
2017Supply of Working Drawings for Parking Bay of Lubok Antu Palm Oil Mill 2
2017Proposed Redevelopment of Song Kheng Hai Rugby Ground.
2020Consulting engineer for Cadangan Pembinaan Pusat Penjaja Di Atas Lot 638, Block 392, Balingian Land District, Kuala Balingan, Sarawak.

Housing & Commercial Development

April 98Consulting engineer on Provision of consultancy services for Kampung Bunga Rampai/Rembus Extension for Housing Development
January 2003Consulting engineer for Proposed Double Storey Quarters on Lot 156, Lubok Antu Town District, Sri Aman Division, Sarawak for Majlis Daerah Lubok Antu.
January 2003Consulting engineer for Proposed Double Storey Detached House on Lot 7043, Blk 16, New Airport Road, Kampung Cemerlang KCLD, Kuching.
January 2005Consulting engineer for Proposed Bungalow on Lot 4 at Borneo Highland Resort Kuching, Sarawak.
June 2009Consulting engineer for proposed 44 units of double storey semi-detached houses on Lots 7534-7545 (part of parent lot 5238), Lots 7949-7960 (part of parent lot 7549), and Lots 8455-8474 (part of parent lots 5536 & 7978), at Section 65, Kuching Town Land District, at 4th mile, Jalan Matang, Kuching.
2012Consulting engineer for proposed 4 units of double storey shophouses on Lots 10089-10092, at Section 65, Kuching Town Land District, at 4th mile, Jalan Matang, Kuching.
2013Consulting engineer for proposed 6 units of shophouses in Serian.
2017Proposed 6 units double-storey semi-detached light industrial on Lots 985,986,987,988,989 and 990, Serian Town District at Jalan Industri/ Temple.
2021Proposed 2 units double-storey light industrial on lot 1240, Block 4, Bukar Sadong Land District at Jalan Kuching-Serian.
May 2023Consulting engineer for MINTRED in Anjung Usahawan Lubok Antu, Batang Ai. (Project in progress)